Value Driven Design Logo

9.01 - Index

Subject

Guides

3 Office Model

4.09

A

Achronyms

9.02

Activity Based Costing (ABC)

8.03

Automatic Identification

5.22

B

Bill of Materials (BOM)

6.13 , 6.18 , 6.20

Broadband

7.09

Business Process Structure

2.02, 2.03, 7.05

C

Capability Studies

4.14, 4.15

Capacity Planning

5.15

Cause and Effect (Ishikawa)

5.34

Cells

4.09 , 5.01, 5.02, 5.03, 5.04, 5.19, 5.21

Change Control

2.04, 6.14

Classification

6.17, 7.19

Client Server Architecture

7.02

Computer Aided Design (CAD)

7.13

Computer Aided Manufacture (CAM)

7.14, 7.17

Computer Aided Process Planning (CAPP)

7.15

Computer Integrated Manufacture (CIM)

7.11

Continuous Improvement

1.05, 2.03

Cost Estimating

6.11, 8.04, 8.05

Critical to Quality (CTQ)

5.36, 6.24

Culture

4.11

D

Data Collection

4.06

Departmental Purpose Analysis (DPA)

5.33

Design FMEA

6.21

Design for Assembly (DFA)

6.09

Design for Manufacture (DFM)

6.10

Design for Six Sigma

6.24

Design to Target Cost (DTC)

6.11, 8.04, 8.05

Documentation

5.27

E

Electronic Data Interchange (EDI)

7.07, 7.08

Ergonomics

4.18

Ethernet

7.09

Executive Workshops

2.02

Experimental Design

5.32

F

Failure Modes & Effects Analysis (FMEA)

4.13, 5.3, 6.21

FRACAS

2.04

Fishbone Diagrams

5.34

G

Group Technology (GT)

6.17

Groupthink

10.02

I

Information Systems Strategy

3.05, 7.01

Information Technology Standards

7.03

Input / Output Analysis

4.03

Integrated Services Digital Network (ISDN)

7.09

Ishikawa

5.34, 6.12

IT Architectures

7.02

J

Job Structure Simplification

4.18

Just-in-Time (JIT)

5.05, 5.17

K

Kanban

5.18

L

Levelled Scheduling

5.13, 5.14

Local Area Networks (LANs)

7.09

M

Machine Systems Integration

7.10

Material Selection

6.15

Materials Flow

5.10

Matrix Organisation

2.05, 5.12

Measures of Performance (MOPs)

5.21

Meetings Structure

2.09

Mixed Mode Operations

5.09

Module Design

5.04

Modular Design

6.18

Monitoring and Control

4.10

N

Nagare Cell Design

5.04, 5.11

Natural Groups

4.01, 4.09, 4.10, 5.01, 5.02, 5.10

Non-Value-Added Activities (NVA)

4.12, 5.06

O

Open Systems Interconnection (OSI)

7.03

Operational Support Documentation

5.27

Organisation Systems

2.09, 4.09, 4.10

Overhead Labour Costs

4.12

P

Pareto Analysis

5.36

Poka Yoke

4.13, 5.31

Preventative Maintenance

5.28

Process Redesign and Improvement

4.02, 4.14, 4.15, 4.16, 5.25

Process Selection

6.16

Product Cost Management (PCM)

8.05

Product Introduction Process (PIP)

6.00, 7.04

Product Life-cycle Management (PLM)

7.20

Programme Management Office

2.11

Project Management

2.01, 2.05, 2.07, 2.09

Project Planning

2.01, 2.05, 2.06

Q

Quality Function Deployment (QFD)

4.13, 6.07, 6.08

R

Risk Priority Number (RPN)

5.30

Rank Order Clustering (ROC)

5.35, 6.19

Repeaters (See Runners)

Runners

2.04, 2.05, 5.06, 5.08, 5.10, 5.12, 5.13, 5.14, 5.15, 5.16, 5.17, 5.18, 6.04, 6.05

S

Scheduling

5.10, 5.13, 5.16

Shainin Methodology (Multi-Vari Chart)

3.04, 5.32

Simulation

7.12

Single Office Concept

4.09

Six Sigma

6.24

Standard Working

5.24

Statistical Process Control (SPC)

4.13, 4.14, 5.29

Step Change

1.05, 2.03

Strangers (See Runners)

Structured Analysis Design Technique (SADT)

4.02, 4.04

Supply Chain

5.06, 5.07 5.10, 5.21

Systems Integration

7.10, 7.21

T

Taguchi

4.13, 6.06

Telecommunications Infrastructure

7.09

Token Ring

7.09

Tool Management

5.23

V

Value Added Network (VAN)

7.09

Value Analysis

6.22

Value Engineering

6.22

Visual Controls

5.20

W

Wide Area Networks (WANs)

7.09