|
Acronym |
Meaning |
|
|
|
A |
ABC |
Activity Based Costing |
|
ABC |
ABC – Classification for Purchased Items |
|
|
|
B |
BOM |
Bill of Materials |
|
BPR |
Business Process Re-engineering |
|
BOSCARDE |
Background, Objectives, Constraints, Assumptions, Reporting, Deliverables, Estimates |
|
|
|
C |
CAD |
Computer Aided Design |
|
CAM |
Computer Aided Manufacturing |
|
CAPP |
Computer Aided Process Planning |
|
CE |
Concurrent Engineering |
|
CIM |
Computer Integrated Manufacture |
|
CM |
Configuration Management |
|
CNC |
Computer Numerically Controlled |
|
CORE |
Controlled Requirements Expression |
|
CPI |
Continuous Process Improvement |
|
CSM |
Component and Supplier Management |
|
CTQ |
Critical To Quality |
|
|
|
D |
DFA |
Design for Assembly |
|
DFM |
Design for Manufacturing |
|
DFSS |
Design for Six Sigma |
|
DOE |
Design of Experiments |
|
DPA |
Department Purpose Analysis |
|
DTC |
Design to Target Cost |
|
|
|
E |
ECB |
Engineering Change Board |
|
ECO |
Engineering Change Order |
|
EDI |
Electronic Data Interchange |
|
EDM |
Engineering Document (or Data) Management (See PDM) |
|
EIS |
Executive Information Systems |
|
|
|
F |
FAST |
Function Analysis System Technique |
|
FEMA |
Failure Modes and Effects Analysis |
|
FRACAS |
Fault Recording and Corrective Action System |
|
FTE |
Full Time Equivalents |
|
|
|
G |
GT |
Group Technology |
|
GUI |
Graphical User Interface |
|
|
|
H |
HR |
Human Resource |
|
HRM |
Human Resource Management |
|
HTML |
Hyper Text Mark-up Language |
|
|
|
I |
I/O |
Input / Output |
|
IDEF0 |
See SADT |
|
IS |
Information Systems |
|
IT |
Information Technology |
|
|
|
J |
JIT |
Just-in-Time |
|
|
|
K |
|
|
|
|
|
L |
LTL |
Lower Tolerance Limit |
|
LIFO |
Last In First Out |
|
|
|
M |
M/C |
Machine |
|
MFD* |
Modular Function Deployment TM |
|
MICR |
Magnetic Ink Character Recognition |
|
MOPS |
Measures of Performance |
|
MPS |
Master Production Schedule |
|
MRP |
Material Requirements Planning |
|
|
|
N |
NC |
Numerically Controlled |
|
NPI |
New Product Introduction |
|
NVA |
No-Value Added |
|
|
|
O |
OCR |
Optical Character Recognition |
|
OE |
Original Equipment |
|
OSI |
Open Systems Interconnection |
|
|
|
P |
PBS |
Product Breakdown Structure |
|
PC |
Personal Computer |
|
PCM |
Product Cost Management |
|
PDM |
Product Data Management |
|
PIP |
Product Introduction Process (also see NPI) |
|
PLM |
Product Lifecycle Management |
|
|
|
Q |
QA |
Quality Assurance |
|
QC |
Quality Control |
|
QFD |
Quality Function Deployment |
|
|
|
R |
R&D |
Research and Development |
|
RF |
Radio Frequency |
|
RM |
Raw Material |
|
ROC |
Rank Order Clustering |
|
RPN |
Risk Priority Number |
|
|
|
S |
SADT |
Structured Analysis Design Technique |
|
SOP |
Sales Order Processing |
|
SPC |
Statistical Process Control |
|
|
|
|
|
|
T |
TLA |
Three Letter Acronym |
|
TOR |
Terms of Reference (also see BOSCARDE) |
|
TQM |
Total Quality Management |
|
TQO |
Total Quality Organisation |
|
|
|
U |
UTL |
Upper Tolerance Limit |
|
UML |
Universal Modelling Language |
|
|
|
V |
VA |
Value Analysis |
|
VE |
Value Engineering |
|
|
|
W |
WBS |
Work Breakdown Structure |
|
WFM |
Work Flow Management |
|
WIP |
Work in Progress |
|
|
|
X |
XML |
Extensible Mark-up Language |
|
|
|
Y |
|
|
|
|
|
Z |
|
|