Phases:
|
Conception
|
Definition
|
Build
|
Distribution
|
Operation
|
Disposal
|
Aliases |
· Marketing
· Concept
· Study
· Research
· Exploration
|
· Development
· Design
· Engineering
· Demonstration & Validation
· Engineering & Manufacturing Development
|
· Fabrication
· Production
· Coding
· Construction
· Manufacturing
|
· Sales
· Delivery
· Installation
· Deployment
|
· Operational
· Maintenance
· Warranties
· Service life
· Performance
· Support
· Repair
|
· Removal
from service
· Disposition
· Unsupported
|
Characteristics |
· Need
· Opportunity
· Mission
· Analysis
· Trade-offs
· Investigation
· Survey
· Functions
|
· Specification
· Preliminary design
· Detailed design
· Manufacturing planning
· Prototyping
· Testing
· Evaluation
|
· Software code & test
· Facility construction
· Assembly
· Installation
· Inspection
|
· Order
· Supply
· Stock
· Transport
· Acceptance
· Installation
· Setup
|
· Use
· Operate
· Maintain
· Service
· Depreciate
|
· Mothball
· Discard
· Deactivate
· Destroy
· Disassemble
· Scrap
· Recycle
|
Other state names |
· Concept
|
· Proto-type or P1
|
· Pre-production or P2
|
· Production or P3
|
· Service
|
· Obsolete
|
Proposed Permitted Actions on various entities and attributes
|
Create New Items |
· Change Control not required
|
· With ‘Lite’ change control
|
· No new items to be introduced without Full Configuration Management
|
Change Functional attribute values |
· No Restriction – Under responsible engineer’s control
|
· Varies – ‘lite’ could imply some attribute changes allowed
|
· No attribute changes allowed.
· May imply new part required for new fit, form or function change when in these states.
· See when to Change a Part Number (section 6.14)
|
Change Business Attributes |
· Change Control not required
|
· Without Change control
|
· Varies - some attributes in some companies require full change control for some non-engineering attributes.
· E. G. Make/Buy flags and supplier changes require some kind of change control in some companies.
|
BOM Creation |
· Change Control not required
|
· Lite change control at project teams discretion.
|
· No new BOM to be introduced without change control
· Items in ‘service only’ and ‘obsolete’ states cannot be used on BOM’s with a lesser state
|
BOM changes |
· Change Control not required
|
· Lite change control at project team’s discretion.
|
· No BOM changes allowed without change control
· Items in ‘service only’ and ‘obsolete’ states cannot be used on BOM’s with a lesser state
|
Other Information
|
LCM Terms |
· None
|
· Ramp – Up
|
· Maturity
|
· Decline
|
· Obsolete
|
Other terms |
· Pre – Release
|
· Post Release
|
· Service only
|
2nd Grader LC Terms |
· Draw it
|
· Make it
|
· Use it
|
· Re-cycle it
|